EJ Prescott, a plumbing supplier, selected NEC to complete their new location featuring office space, warehouse and showroom. This 13,000 sqft ground up metal building including the construction of the free standing building with fit outs of the office spaces, showroom and warehouse spaces, site work with grading, landscaping and parking.
Client: EJ Prescott
New England Construction provided Design/Build services for the construction of five regional distribution and automated laundry facilities: a 45,000 sf facility in Cumberland, RI; a 60,000 sf facility in Portland, ME; a 57,000 sf facility in West Philadelphia, PA; a 60,000 sf facility in Hamburg, SC; and a 60,000 sf facility in Morgantown, WV. Each regional facility incorporates a combination of business offices, training areas, break room, cafeteria and automated laundry systems.
Client: Cintas Corporation
The new, one-story, 14,000 sf facility encompasses administrative offices, an assembly/fabrication area, a conference room, a cafeteria and an employee locker area with showers. The interior design offers a clean, contemporary feeling - most notably in the entry lobby and visitor reception area. The building exterior is a combination of concrete masonry units, metal panel systems in various colors and aluminum glazing systems with rubber membrane roofing.
Client: Polyrack North America
This project involved the ground up construction of a new 27,500 sf metal building that included warehouse space produced to meet the unique needs of a snow removal company and an upper level designed as functional and showcase space for the Case Snow Management corporate headquarters. The warehouse area had to accommodate the unique machinery Case utilizes and also be adaptable to their workforce that grows exponentially during the winter season. The second level featured high end office work spaces, a gym/recreational space for the staff, and a higher capacity conference room. This project fused the functionality & ease of a metal building with the detailed higher end needs of Case’s corporate work space.
Client: Case Snow Management
New England Construction is currently taking the lead in preconstruction on Design Build project consisting of a 160,000sf industrial warehouse building in Pawtucket, RI. This project is a "spec" warehouse project with built in flexibility for one or more tenants. The project will include tilt-up and pre-cast construction. The warehouse will include 16 loading docks, with the potential for 9 additional loading docks through knockouts. There will be two ground-level overhead doors, exterior glass for natural lighting, and space for two tenants. This project is valued at $19.7M, coming in at $83 per square foot.
Client: JK Equities
The New England Construction team is partnered with North Point to deliver tenant improvements for Peak Event Services newest warehouse location in Warwick, RI. This project is complete with 110,000sqft of open warehouse space along with additional spaces for office operations including offices, training room, restrooms and large breakroom. This large scale project also includes a paint room and fabrication rooms.
Client: North Point