This project involved the ground up construction of a new 27,500 sf metal building that included warehouse space produced to meet the unique needs of a snow removal company and an upper level designed as functional and showcase space for the Case Snow Management corporate headquarters. The warehouse area had to accommodate the unique machinery Case utilizes and be adaptable to their workforce that grows exponentially during the winter season. The second level featured high-end office workspaces, a gym/recreational space for the staff, and a higher capacity conference room. This project fused the functionality & ease of a metal building with the detailed higher end needs of Case’s corporate workspace.
Project Owner: Case Snow Management
Construction Cost: $2,200,000
New England Construction provided Design/Build services for the construction of five regional distribution and automated laundry facilities: a 45,000-sf facility in Cumberland, RI; a 60,000-sf facility in Portland, ME; a 57,000-sf facility in West Philadelphia, PA; a 60,000-sf facility in Hamburg, SC; and a 60,000 sf facility in Morgantown, WV. Each regional facility incorporates a combination of business offices, training areas, break room, cafeteria and automated laundry systems.
Project Owner: Cintas Corporation
Construction Cost: $40,000,000
This renovation and addition encompass more than 100,000 sf of space. The new 62,400 sf addition features two levels of open office space, executive offices, conference rooms, and a new hydraulic elevator. A major solar panel installation, as well as heat recovery of thermal energy, was integrated into the new facility. Renovations within the existing building include a fitness center with locker rooms and a new employee cafeteria. The 40,000 sf of manufacturing space includes high-reflective concrete flooring in the production, quality control and shipping/receiving areas, as well as a state-of-the-art 6,000 sf ISO Class-8 clean room. Site improvements included surface parking for 200 cars, a new storm water management system, landscaped planting, beds and lawn area.
Project Owner: Putnam Plastics
Construction Cost: $4,000,000
NEC worked with Polyrack North America on their commercial facility. The new, one-story, 14,000 sf facility encompassed administrative offices, an assembly/fabrication area, a conference room, a cafeteria and an employee locker area with showers. The interior design offers a clean, contemporary feeling - most notably in the entry lobby and visitor reception area. The building exterior is a combination of concrete masonry units, metal panel systems in various colors and aluminum glazing systems with rubber membrane roofing.
Project Owner: Polyrack North America
Construction Cost: $2,500,000