

New England Construction is currently delivering the redevelopment of the JK Equities distribution center at 1 Moshassuck Street in Pawtucket, a 150,000-square-foot industrial facility designed to support modern warehouse and distribution operations. The project utilizes a precast concrete wall building system, providing enhanced durability, accelerated construction, and long-term performance while meeting the demands of high-volume logistics use.
The scope includes comprehensive site and utility improvements across multiple parcels, including grading, drainage, stormwater management, new utility connections, and traffic and access improvements. Through close coordination with local agencies and utility providers, the project is being executed with careful attention to site constraints and regulatory requirements, positioning the facility as a high-performing, future-ready industrial asset.
This project consisted of the ground-up construction of a new 13,125 SF office, showroom, and warehouse facility for E.J. Prescott in West Bridgewater, Massachusetts. The scope included full site development, foundations, slab-on-grade, and the complete erection of a pre-engineered metal building system, including structural steel framing, metal wall panels, roofing, and building envelope coordination. The project also integrated loading docks, overhead doors, and exterior metal cladding, along with interior buildout for office and showroom spaces, delivering a durable, efficient industrial facility designed to support both operational and customer-facing functions
This project involved the ground up construction of a new 27,500 sf metal building that included warehouse space produced to meet the unique needs of a snow removal company and an upper level designed as functional and showcase space for the Case Snow Management corporate headquarters. The warehouse area had to accommodate the unique machinery Case utilizes and also be adaptable to their workforce that grows exponentially during the winter season. The second level featured high end office work spaces, a gym/recreational space for the staff, and a higher capacity conference room. This project fused the functionality & ease of a metal building with the detailed higher end needs of Case’s corporate work space.
New England Construction completed the tenant improvements for PEAK Event Services at the I-95 Gateway in Warwick, Rhode Island, delivering a fully built-out 126,686-square-foot warehouse and office facility designed to support large-scale event logistics and operations. The project centered on the transformation of an existing industrial shell into a high-functioning distribution and production hub, anchored by approximately 110,000 square feet of warehouse space complemented by integrated office, training, fabrication, and support areas.
The scope included extensive interior construction within the warehouse, such as new dock door openings, material handling support areas, high-piled storage coordination, ESFR fire protection integration, and upgraded lighting and power systems tailored to operational demands. Associated office and production spaces were constructed to support administrative, dispatch, and fabrication functions, creating a seamless connection between front-office operations and warehouse activity