Who We Serve

Local Roots. Broad Reach.

Zoom to view our recent geographic presence. 

 
icon

Sally’s Apizza

Fairfield, CT

Completion Date: September 2021

Cost: $1,300,000

Category: In Progress
icon

Mega Disposal

Seekonk, MA

Completion Date: August 2021

Cost: $2,000,000

Category: In Progress
icon

Bryant University Bathroom Renovation

Smithfield, RI

Completion Date: August 2021

Cost: $700,000

Category: In Progress
icon

Dollar Tree

Sunapee, NH

Completion Date: October 2021

Cost: $1,250,000

Category: In Progress
icon

Chipotle

North Conway, NH

Completion Date: August 2021

Cost: $566,813

Category: In Progress
icon

Bristol Plaza

Bristol, CT

Completion Date: September 2021

Cost: $206,603

Category: In Progress
icon

Dental Partners of Seaport

Boston, MA

Completion Date: September 2021

Cost: $-

Category: In Progress
icon

Holyoke Landing

Holyoke, MA

Completion Date: November 2021

Cost: $-

Category: In Progress
icon

Grace Apartments

Boston, MA

Completion Date: May 2022

Cost: $-

Category: In Progress
icon

Meeting Steet School Phase II

Providence, RI

Completion Date: August 2021

Cost: $-

Category: In Progress
icon

Providence Community Health Center

Providence, RI

Completion Date: November 2021

Cost: $7,771,098

Category: In Progress
icon

Petco

Medford, MA

Completion Date: July 2021

Cost: $443,109

Category: In Progress
icon

WellOne

Pascoag, RI

Completion Date: September 2021

Cost: $1,613,307

Category: In Progress
icon

Starbucks

South Easton, MA

Completion Date: September 2021

Cost: $1,391,908

Category: In Progress
icon

AAA

Providence, RI

Completion Date: September 2021

Cost: $1,750,000

Category: In Progress
icon

7Eleven

Waterbury, CT

Completion Date: November 2021

Cost: $1,547,911

Category: In Progress
icon

7Eleven

West Haven, CT

Completion Date: January 2022

Cost: $5,449,855

Category: In Progress
icon

Meadowbrook Waldorf School

West Kingston, RI

Completion Date: July 2020

Cost: $4,538,500

Category: Completed
icon

Citizens Bank

Stamford, CT

Completion Date: June 2020

Cost: $822,431

Category: Completed
icon

Bryant University Residence Halls 10-13

Smithfield, RI

Completion Date: June 2020

Cost: $4,500,000

Category: Completed
icon

1200 Quaker Lane

Warwick, RI

Completion Date: May 2020

Cost: $1,957,106

Category: Completed
icon

Petco

Needham, MA

Completion Date: May 2020

Cost: $870,205

Category: Completed
icon

Dick’s Sporting Goods

Brockton, MA

Completion Date: March 2020

Cost: $4,995,605

Category: Completed
icon

Burlington

North Dartmouth, MA

Completion Date: March 2020

Cost: $4,016,146

Category: Completed
icon

Meeting Street Phase I

Providence, RI

Completion Date: September 2019

Cost: $9,000,000

Category: Completed
icon

Edge Fitness

Cranston, RI

Completion Date: December 2019

Cost: $1,400,000

Category: Completed
icon

321 South Main Street Garage and Shell Work

Providence, RI

Completion Date: December 2019

Cost: $3,000,000

Category: Completed
icon

Dollar General

East Providence, RI

Completion Date: December 2019

Cost: $935,000

Category: Completed
icon

Dollar Tree

Wareham, MA

Completion Date: December 2019

Cost: $1,276,500

Category: Completed
icon

Pet Supplies Plus

Plymouth, MA

Completion Date: January 2020

Cost: $786,584

Category: Completed
icon

Charles Schwab

Providence, RI

Completion Date: December 2019

Cost: $587,927

Category: Completed
icon

Citizens Bank

Medfield, MA

Completion Date: December 2019

Cost: $352,856

Category: Completed
icon

84/86 Taunton Street

Plainville, MA

Completion Date: September 2019

Cost: $3,700,000

Category: Completed
icon

Gotham Greens-Providence, RI

Completion Date: September 2019

Cost: $4,300,000

Category: Completed
icon

CCK Fit Out

Providence, RI

Completion Date: August 2019

Cost: $4,500,000

Category: Completed
icon

Seritage (Skechers and Hook & Reel)

Warwick, RI

Completion Date: August 2019

Cost: $540,000

Category: Completed
icon

Bryant University Townhouse Project

Smithfield, RI

Completion Date: August 2019

Cost: $7,000,000

Category: Completed
icon

Bonobos

Hingham, MA

Completion Date: August 2019

Cost: $220,000

Category: Completed
icon

4 Plaza Way

Fairhaven, MA

Completion Date: September 2019

Cost: $576,985

Category: Completed
icon

Bubbles to Butterfly

Norwich, CT

Completion Date: June 2019

Cost: $2,000,000

Category: Completed
icon

Simon Konover Office

Hartford, CT

Completion Date: August 2019

Cost: $1,800,000

Category: Completed
icon

Aldi Supermarket

Fall River, MA

Completion Date: August 2019

Cost: $1,600,000

Category: Completed
icon

Starbucks Coffee

Kingston, MA

Completion Date: February 2019

Cost: $930,000

Category: Completed
icon

Vista Point

Plymouth, MA

Completion Date: March 2019

Cost: $1,400,000

Category: Completed
icon

Petco

Smithfield, RI

Completion Date: May 2019

Cost: $1,400,000

Category: Completed
icon

Chick-fil-A

Newington, CT

Completion Date: March 2019

Cost: $2,012,000

Category: Completed
icon

Bartlett Consolidated

Plymouth, MA

Completion Date: March 2019

Cost: $2,100,000

Category: Completed
icon

Retail Building C

Wareham, MA

Completion Date: February 2019

Cost: $588,000

Category: Completed
icon

Mattress Firm & Retail Building B

Wareham, MA

Completion Date: December 2018

Cost: $1,600,000

Category: Completed
icon

Amica Mutual Insurance

Lincoln, RI

Completion Date: January 2019

Cost: $4,200,000

Category: Completed
icon

Bryant University Locker Room

Smithfield, RI

Completion Date: December 2018

Cost: $1,944,000

Category: Completed
icon

Aldi Supermarket

Johnston, RI

Completion Date: October 2018

Cost: $1,450,000

Category: Completed
icon

Bartaco Restaurant

Boston, MA

Completion Date: October 2018

Cost: $1,655,000

Category: Completed
icon

MidiCi Pizza

East Providence, RI

Completion Date: September 2018

Cost: $487,000

Category: Completed
icon

New Country Mercedes Benz

Hartford, CT

Completion Date: Phase 1 – May 2018, Phase II – September 2018

Cost: $1,300,000

Category: Completed
icon

Westgate Mall

Brockton, MA

Completion Date: September 2018

Cost: $4,933,000

Category: Completed
icon

Panera Bread

Everett, MA

Completion Date: September 2018

Cost: $750,000

Category: Completed
icon

Aldi Supermarket

Leominster, MA

Completion Date: June 2018

Cost: $500,000

Category: Completed
icon

290 Newport Avenue Retail Space

East Providence, RI

Completion Date: September 2018

Cost: $350,000

Category: Completed
icon

Westford Valley Marketplace

Westford, MA

Completion Date: September 2018

Cost: $1,660,000

Category: Completed
icon

Chick-fil-A

Glastonbury, CT

Completion Date: June 2018

Cost: $754,000

Category: Completed
icon

O’Reilly Auto Parts

East Providence, RI

Completion Date: July 2018

Cost: $1,083,802

Category: Completed
icon

Wayland Shopping Plaza

Wayland, MA

Completion Date: June 2018

Cost: $2,200,000

Category: Completed
icon

Lincoln Mall Outlot Building

Lincoln, RI

Completion Date: June 2018

Cost: $1,578,000

Category: Completed
icon

Dick’s Sporting Goods

Waterford, CT

Completion Date: June 2018

Cost: $616,000

Category: Completed
icon

East Side Pediatrics

Providence, RI

Completion Date: March 2018

Cost: $250,000

Category: Completed
icon

Aldi Supermarket

Springfield, MA

Completion Date: May 2018

Cost: $778,000

Category: Completed
icon

BreakScape (Tenant Work)

Chelsea, MA

Completion Date: March 2018

Cost: $430,000

Category: Completed
icon

BreakScape (Landlord Work)

Chelsea, MA

Completion Date: March 2018

Cost: $360,000

Category: Completed
icon

American Durafilm

Holliston, MA

Completion Date: March 2018

Cost: $1,052,000

Category: Completed
icon

Middlebridge School

Narragansett, RI

Completion Date: February 2018

Cost: $2,600,000

Category: Completed
icon

Whirlpool Research and Development Lab

Fall River, MA

Completion Date: Phase I - March 2017, Phase II – February 2018

Cost: $730,000

Category: Completed
icon

Capital One Cafe

Somerville, MA

Completion Date: December 2017

Cost: $2,100,000

Category: Completed
icon

Chick-fil-A

Southington, CT

Completion Date: December 2017

Cost: $1,600,000

Category: Completed
icon

Moses Brown/SquashBusters Athletic Facility

Providence, RI

Completion Date: November 2017

Cost: $6,000,000

Category: Completed
icon

Rumford Center Phase II

Rumford, RI

Completion Date: November 2017

Cost: $11,300,000

Category: Completed
icon

Aldi

Wareham, MA

Completion Date: November 2017

Cost: $1,700,000

Category: Completed
icon

Wareham Marketplace

Wareham, MA

Completion Date: November 2017

Cost: $2,400,000

Category: Completed
icon

Dick’s Sporting Goods

Warwick, RI

Completion Date: November 2017

Cost: $5,000,000

Category: Completed
icon

Moses Brown Y Lab Renovation

Providence, RI

Completion Date: November 2017

Cost: $830,000

Category: Completed
icon

Planet Fitness

Warwick, RI

Completion Date: November 2017

Cost: $385,000

Category: Completed
icon

First Auto Chrysler

North Attleboro, MA

Completion Date: September 2017

Cost: $4,900,000

Category: Completed
icon

Walnut Street Center/Care 291

Medford, MA

Completion Date: May 2017

Cost: $3,725,000

Category: Completed
icon

Kincora Development

West Kingston, RI

Completion Date: May 2017

Cost: $1,800,000

Category: Completed
icon

China Eternal

Raynham, MA

Completion Date: May 2017

Cost: $1,400,000

Category: Completed
icon

PetSmart Hadley

Hadley, MA

Completion Date: April 2017

Cost: $1,000,000

Category: Completed
icon

KVH

Middletown, RI

Completion Date: April 2017

Cost: $2,100,000

Category: Completed
icon

PODS Swimming Aquatic Center

East Providence, RI

Completion Date: March 2017

Cost: $3,000,000

Category: Completed
icon

Boch Ferrari/Maserati

Norwood, MA

Completion Date: April 2017

Cost: $2,500,000

Category: Completed
icon

URI Engineering at Schneider Electric

West Kingston, RI

Completion Date: January 2017

Cost: $1,200,000

Category: Completed
icon

ARC of Massachusetts

Waltham, MA

Completion Date: March 2017

Cost: $1,100,000

Category: Completed
icon

PetSmart Bourne

Bourne, MA

Completion Date: March 2017

Cost: $1,700,000

Category: Completed
icon

Staples

Somersworth, NH

Completion Date: December 2016

Cost: $1,600,000

Category: Completed
icon

Conneaut Industries

West Greenwich, RI

Completion Date: December 2016

Cost: $1,500,000

Category: Completed
icon

RK Center Middletown

Middletown, RI

Completion Date: December 2016

Cost: $900,000

Category: Completed
icon

Sonic Drive-In

Stoughton, MA

Completion Date: November 2016

Cost: $1,200,000

Category: Completed
icon

Neighbors Emergency Center

West Warwick, RI

Completion Date: November 2016

Cost: $1,200,000

Category: Completed
icon

WS Development (PetSmart)

New Brunswick, ME

Completion Date: November 2016

Cost: $1,400,000

Category: Completed
icon

Lowell General Hospital (Building Addition)

North Billerica, MA

Completion Date: September 2016

Cost: $960,000

Category: Completed
icon

RK Centers (Ulta Beauty & Paper Store)

Taunton, MA

Completion Date: September 2016

Category: Completed
icon

Bed, Bath & Beyond

Brunswick, ME

Completion Date: September 2016

Cost: $2,000,000

Category: Completed
icon

Clay Subaru

Norwood, MA

Completion Date: September 2016

Cost: $730,000

Category: Completed
icon

Burlington Store

Warwick, RI

Completion Date: August 2016

Cost: $2,750,000

Category: Completed
icon

RI Mall Redevelopment

Warwick, RI

Completion Date: August 2016

Cost: $7,500,000

Category: Completed
icon

Rockin’ & Roastin’ Café

N. Attleboro, MA

Completion Date: June 2016

Cost: $1,000,000

Category: Completed
icon

Kimco (Petco)

Sturbridge, MA

Completion Date: July 2016

Cost: $715,000

Category: Completed
icon

Summit Realty Partners (Petco)

East Longmeadow, MA

Completion Date: June 2016

Cost: $1,000,000

Category: Completed
icon

AnyTime Fitness/Frankie’s Bistro

North Kingston, RI

Completion Date: July 2016

Cost: $400,000

Category: Completed
icon

Amego, Inc.

Northboro, MA

Completion Date: March 2016

Cost: $1,700,000

Category: Completed
icon

Case Snow Management

N. Attleboro, MA

Completion Date: March 2016

Cost: $2,200,000

Category: Completed
icon

Kimco

Woodbury, NY

Completion Date: February 2016

Cost: $475,000

Category: Completed
icon

PCA Architects

Cambridge, MA

Completion Date: February 2016

Cost: $400,000

Category: Completed
icon

Petco at Wickford Junction

North Kingstown, RI

Completion Date: February 2016

Cost: $1,400,000

Category: Completed
icon

Waterstone Retail (Marshalls/HomeGoods & PetSmart Fit Outs)

Scarborough Gallery, ME

Completion Date: February 2016

Cost: $2,500,000

Category: Completed
icon

Scott Volkswagen

East Providence, RI

Completion Date: January 2016

Cost: $655,000

Category: Completed
icon

Waterstone Retail (Family Dollar, Save-a-Lot, O’Reilly Auto Parts)

Methuen, MA

Completion Date: December 2015

Cost: $1,000,000

Category: Completed
icon

KKRS

Wickford Junction, RI

Completion Date: December 2015

Cost: $300,000

Category: Completed
icon

LA Fitness

Stratford, CT

Completion Date: December 2015

Cost: $2,890,000

Category: Completed
icon

Silver City Galleria (MG Herring Landlord Work)

Taunton, MA

Completion Date: October 2015

Cost: $750,000

Category: Completed
icon

LA Fitness

Natick, MA

Completion Date: October 2015

Cost: $5,200,000

Category: Completed
icon

Precision Digital

Hopkinton, MA

Completion Date: September 2015

Cost: $1,600,000

Category: Completed
icon

Ocean State Job Lot / Dollar Tree

Westerly, RI

Completion Date: August 2015

Cost: $400,000

Category: Completed
icon

Brixmor (LA Fitness)

Stratford, CT

Completion Date: July 2015

Cost: $2,500,000

Category: Completed
icon

PETCO

Shrewsbury, MA

Completion Date: June 2015

Cost: $1,200,000

Category: Completed
icon

Dr. Buehler

Wellesley, MA

Completion Date: May 2015

Cost: $400,000

Category: Completed
icon

Two East Bacon

Plainville, MA

Completion Date: April 2015

Cost: $6,000,000

Category: Completed
icon

HMV Solar Ventures

Johnston, RI

Completion Date: May 2015

Cost: $2,580,000

Category: Completed
icon

YMCA Camp Fuller

Wakefield, RI

Completion Date: June 2015

Cost: $1,100,000

Category: Completed
icon

HMV Solar Ventures

N. Kingstown, RI

Completion Date: May 2015

Cost: $950,000

Category: Completed
icon

Corner Bakery

Middletown, RI

Completion Date: April 2015

Cost: $559,000

Category: Completed
icon

LA Fitness

Warwick, RI

Completion Date: April 2015

Cost: $4,200,000

Category: Completed
icon

CarMax

Cranston, RI

Completion Date: March 2015

Cost: $6,900,000

Category: Completed
icon

Dr. Ghenta

N. Dartmouth, MA

Completion Date: Feb 2015

Cost: $1,000,000

Category: Completed
icon

Millstone Medical

Fall River, MA

Completion Date: February 2015

Cost: $5,300,000

Category: Completed
icon

Stetson School

Barre, MA

Completion Date: January 2015

Cost: $2,050,000

Category: Completed
icon

Boys & Girls Club

Pawtucket, RI

Completion Date: December 2014

Cost: $6,000,000

Category: Completed
icon

Mallory Ridge

Bloomfield, CT

Completion Date: September 2014

Cost: $13,000,000

Category: Completed
icon

Bryant College

Smithfield, RI

Completion Date: August 2014

Cost: $2,500,000

Category: Completed
icon

Premier Toyota & Scion

Newport, RI

Completion Date: August 2014

Cost: $2,000,000

Category: Completed
icon

The Village at Colony Place

Plymouth, MA

Completion Date: August 2014

Cost: $1,000,000

Category: Completed
icon

Phoenix Electric

Canton, MA

Completion Date: August 2014

Cost: $600,000

Category: Completed
icon

Corner Bakery

Westbury, NY

Completion Date: August 2014

Cost: $900,000

Category: Completed
icon

Corner Bakery

South Plainfield, NJ

Completion Date: August 2014

Cost: $600,000

Category: Completed
icon

Balise Subaru

West Warwick, RI

Completion Date: August 2014

Cost: $4,000,000

Category: Completed
icon

Garden City Center Phase II Village Expansion

Cranston, RI

Completion Date: August 2014

Cost: $5,000,000

Category: Completed
icon

White Cliffs Country Club - Plymouth, MA

Completion Date: July 2014

Cost: $1,300,000

Category: Completed
icon

Norfolk Power Equipment

Carver, MA

Completion Date: July 2014

Cost: $1,700,000

Category: Completed
icon

Bonnell Ford

Winchester, MA

Completion Date: May 2014

Cost: $1,700,000

Category: Completed
icon

Corner Bakery

Cranston, RI

Completion Date: March 2014

Cost: $1,000,000

Category: Completed
icon

Dartmouth Retail - Dartmouth, MA

Completion Date: March 2014

Cost: $900,000

Category: Completed
icon

Balise Chevrolet - Warwick, RI

Completion Date: November 2013

Cost: $2,600,000

Category: Completed
icon

Clay Nissan

Newton, MA

Completion Date: October 2013

Cost: $1,000,000

Category: Completed
icon

Balise Volkswagen

Warwick, RI

Completion Date: October 2013

Cost: $1,200,000

Category: Completed
icon

Flywheel Boston @ The Prudential

Boston, MA

Completion Date: October 2013

Cost: $700,000

Category: Completed
icon

Tower Plaza

Melrose, MA

Completion Date: November2013

Cost: $500,000

Category: Completed
icon

Crossroads Shopping Center

White Plains, NY

Completion Date: November 2013

Cost: $800,000

Category: Completed
icon

Petra Somerville-Brooklyn Boulders

Somerville, MA

Completion Date: July 2013

Cost: $20,000,000

Category: Completed
icon

LA Fitness

Cranston, RI

Completion Date: July 2013

Cost: $1,000,000

Category: Completed
icon

Bayside YMCA

Barrington, RI

Completion Date: June 2013

Cost: $5,500,000

Category: Completed
icon

GTECH

Providence, RI

Completion Date: May 2013

Cost: $300,000

Category: Completed
icon

Balise Nissan

Warwick, RI

Completion Date: May 2013

Cost: $2,600,000

Category: Completed
icon

Belmont Commons

Pawtucket, RI

Completion Date: April 2013

Cost: $1,588,000

Category: Completed
icon

IRA Toyota

Danvers, MA

Completion Date: April 2013

Cost: $2,300,000

Category: Completed
icon

Putnam Plastics

Putnam, CT

Completion Date: February 2013

Cost: $4,000,000

Category: Completed
icon

702 Main Townhouses

Completion Date: Completion: February 2013

Cost: $900,000

Category: Completed
icon

Pottery Barn

Cranston, RI

Completion Date: February 2013

Cost: $2,000,000

Category: Completed
icon

Manufacturing Plant

Ohio (Confidential Client)

Completion Date: December 2012

Category: Completed
icon

Marshfield Commons

North Smithfield, RI

Completion Date: December 2012

Cost: $6,200,000

Category: Completed
icon

White City Building J

Shrewsbury, MA

Completion Date: December 2012

Cost: $1,100,000

Category: Completed
icon

Clay Hyundai- Norwood, MA

Completion Date: November 2012

Cost: $750,000

Category: Completed
icon

Planet Fitness

Shrewsbury, MA

Completion Date: November 2012

Cost: $1,000,000

Category: Completed
icon

Williams Sonoma & Clarks Shoes

Cranston, RI

Completion Date: November 2012

Cost: $600,000

Category: Completed
icon

Weekapaug Inn

Westerly, RI

Completion Date: October 2012

Cost: $14,500,000

Category: Completed
icon

Saccucci Honda

Middletown, RI

Completion Date: October 2012

Cost: $2,650,000

Category: Completed
icon

Concord Country Club

Concord, MA

Completion Date: August 2012

Cost: $1,865,850

Category: Completed
icon

Mechanics Mill

Fall River, MA

Completion Date: September 2012

Cost: $2,500,000

Category: Completed
icon

White City Building F

Shrewsbury, MA

Completion Date: November, 2012

Cost: $475,000

Category: Completed
icon

Prime Honda

Saco, ME

Completion Date: July 15, 2012

Cost: $2,210,500

Category: Completed
icon

Clay Chevrolet

Norwood, MA

Completion Date: February15, 2012

Cost: $2,400,000

Category: Completed
icon

Nissan Village

North Attleboro, MA

Completion Date: September 2011

Cost: $2,812,000

Category: Completed
icon

130 Broadway

Somerville, MA

Completion Date: November 2011

Cost: $1,800,000

Category: Completed
icon

Concordia Fibers

Coventry, RI

Completion Date: November 2011

Cost: $650,000

Category: Completed
icon

Stonehill College

Bathroom Renovations

Completion Date: August 2011

Cost: $362,000

Category: Completed
icon

Cintas Uniforms

Morgantown, West Virginia

Completion Date: July 2011

Cost: $4,100,000

Category: Completed
icon

Northwest Community Health Center - Pascoag, RI

Completion Date: July 2011

Cost: $1,076,345

Category: Completed
icon

Scott Volkswagen

East Providence, RI

Completion Date: January 2016

Cost: $655,000

Category: Completed
icon

Women & Infants Hospital - Providence, RI

Completion Date: June 2011

Cost: $407,916

Category: Completed
icon

Technic Inc. - Woonsocket, RI

Completion Date: May 2011

Cost: $1,815,258

Category: Completed
icon

Brown University Davol Square

Providence, RI

Completion Date: May 2011

Cost: $673,988

Category: Completed
icon

American Power Conversion (APC) - West Kingston, RI

Completion Date: March 2011

Cost: $350,000

Category: Completed
icon

Ocean State Job Lot

Medford MA

Completion Date: November 1, 2010

Cost: $899,000

Category: Completed
icon

Anthropologie @ Garden City Center

Cranston RI

Completion Date: December 2010

Cost: $325,000

Category: Completed
icon

MedCure

Cumberland, RI

Completion Date: December 2010

Cost: $1,699,279

Category: Completed
icon

Brown University Sayles Hall

Providence, RI

Completion Date: January 2011

Cost: $238,621

Category: Completed
icon

Dr. Olivera

Wareham, MA

Completion Date: November 2010

Cost: $350,802

Category: Completed
icon

Johnson & Wales Café & Starbucks

Providence, RI

Completion Date: August 2010

Cost: $797,207

Category: Completed
icon

Mercedes of Fairfield, CT (Penske Auto Group)

Completion Date: July 2010

Cost: $1,057,000

Category: Completed
icon

Cumberland Commerce 3

Cumberland RI

Completion Date: June 2010

Cost: $1,071,444

Category: Completed
icon

The Amego School

North Attleboro, MA

Completion Date: July 2010

Cost: $3,028,000

Category: Completed
icon

The Providence Center

Providence, RI

Completion Date: June 2010

Cost: $193,000

Category: Completed
icon

3-9 Steeple Street

Providence, RI

Completion Date: March 2010

Cost: $2,216,510

Category: Completed
icon

St. Mary’s Bay View Academy

Riverside, RI

Completion Date: March 2010

Cost: $716,170

Category: Completed
icon

Cintas Uniform - Ladson, South Carolina

Completion Date: April 2010

Cost: $5,982,014

Category: Completed
icon

Cox Communications

Cafeteria & Call Center - West Warwick, RI

Completion Date: January 2010

Cost: $285,359

Category: Completed
icon

Home & Hospice Care of Rhode Island

Providence, RI

Completion Date: June 2009

Cost: $7,758,120

Category: Completed
icon

Aldi Markets

North Windham, CT

Completion Date: May 2009

Cost: $1,999,663.2

Category: Completed
icon

Sakonnet Golf Club

Little Compton, RI

Completion Date: May 2009

Cost: $1,252,197

Category: Completed
icon

Wampanoag Plaza

East Providence, RI

Completion Date: April 2009

Cost: $581,125.43

Category: Completed
icon

Cumberland Commerce 2

Cumberland, RI

Completion Date: January 2009

Cost: $1,713,531

Category: Completed
icon

Independence Square/ University of Rhode Island

South Kingstown, RI

Completion Date: April 2009

Cost: $6,818,764

Category: Completed
icon

Penske Automotive Group New Car Dealerships

Fairfield & Danbury, CT

Completion Date: April 2009

Cost: $11,300,000

Category: Completed
icon

Penske Truck Lease

Londonderry, NH

Completion Date: January 2009

Category: Completed
icon

Rumford Center

Rumford, RI

Completion Date: February 2009

Cost: $19,070,721

Category: Completed
icon

Parcel 6

Providence, RI

Completion Date: March 2020

Cost: $23,000,000

Category: In Progress
icon

Sally’s Apizza

Stamford, CT

Completion Date: March 2020

Cost: $1,300,000

Category: In Progress
icon

Kinfolks BBQ Restaurant

Easton, MA

Completion Date: September 2020

Cost: $200,000

Category: Completed
icon

5 Below

Smithfield, RI

Completion Date: September 2020

Cost: $961,992

Category: Completed
icon

Hannaford

North Brookfield, MA

Completion Date: October 2020

Cost: $1,049,558

Category: Completed
icon

Emerald Pines

Methuen, MA

Completion Date: December 2020

Cost: $3,034,406

Category: Completed
icon

Citizens Bank

Stamford, CT

Completion Date: June 2020

Cost: $822,431

Category: Completed
icon

Seaside at Scituate Commons

Scituate, MA

Completion Date: December 2020

Cost: $2,877,813

Category: Complete
icon

Beth Israel Phase

Quincy, MA

Completion Date: August 2020

Cost: $962,225

Category: Complete
icon

Meadowbrook Waldorf School

West Kingston, RI

Completion Date: July 2020

Cost: $4,538,500

Category: Complete
icon

Cook’s Corner - Staples

Brunswick, ME

Completion Date: June 2020

Cost: $4,355,929

Category: Complete
icon

Regency at Glen Ellen

Millis, MA

Completion Date: August 2020

Cost: $218,000

Category: Complete
icon

Dollar Tree

Sandwich, MA

Completion Date: August 2020

Cost: $1,383,266

Category: Complete
icon

Dollar General

Lancaster, NH

Completion Date: October 2020

Cost: $950,000

Category: Complete

Explore by Market Vertical

While our management approach is a disciplined methodology that we have honed in over time, we always adapt it to the unique aspects of the specific project programming, site logistics, scheduling, phased construction and specific project risk management. Our focus is on client advocacy through precise schedule management, direct and honest communication, cost controls, proactive problem solving and exemplary customer service.